1. 重采购点能够覆盖一般的物料需求,使其满足在货期提前之内。
The reorder point should cover the average material requirements expected during the replenishment lead time.

2. 安全库存的存在能够覆盖在一个货期提前之内的过度的物料消耗,同时也能覆盖可能出现的由于交货延迟导致的任何额外的需求。

The safety stock exists to cover both excess material consumption within the replenishment lead time and any additional requirements that may occur due to delivery delays.
replenishment lead time.是大部分书上提供的译法。
为您解答
move up
in advance
ahead of time
都可以
罢工的时间提前了。
The time for the strike has been moved up.
免责声明:本平台仅供信息发布交流之途,请谨慎判断信息真伪。如遇虚假诈骗信息,请立即举报
举报